Restoration office and workshop hall 12m x 45m x 4,5m
Place of fulfillment: Pécel
Completed works:
- Manufacturing of steel support structure for hall
- Surface treatment of the hall's steel support structure
- Installation of the hall's steel support structure on site
- Placement of Z beams in the plane of the roof and sides
- Placement of roof panel in the roof plane
- Placement of side panel in the side plane
- Forming of the receiving structure of sectional industrial gate
- Forming the place of plastic windows and their installation
- Making the ridge cover of the hall with bent cone sheet and profile sponge
- Installation of hanging gutter and drain gutter system
- Other tinsmith (hemming) works