frontend.footer.menu frontend.footer.menu

Hall - Nick

csarnok-nick

Hall 12m x 45m x 5m

Place of fulfillment: Nick

Completed works:

  • Manufacturing of steel support structure for hall
  • Surface treatment of the hall's steel support structure
  • Installation of the hall's steel support structure on site
  • Placement of Z beams in the plane of the roof and sides
  • Placement of trapezoidal roof slabs in the roof plane
  • Placement of trapezoidal side slabs in the side plane
  • Manufacturing suspended steel framed sliding doors and installation on site
  • Making the ridge cover of the hall with bent cone sheet and profile sponge
  • Installation of hanging gutter and drain gutter system
  • Other tinsmith (hemming) works